Description
You have only limited MS Project Scheduling skills? After taking this E-Learning Course you will be able to translate the total set of activities to complete your project scope into a MS Project work breakdown structure; complete and well-structured.
The E-Course on Maturity Level 2 is about creating the backbone for your schedule, with tasks, summary tasks, but also with a baseline so you can already start learning from the quality of your estimates. You will learn a method to come up with estimates that have the right mix between being SMART and covering enough risk contingency.
A custom view that you will receive from us will then tell you how good the estimates were. For instance, you could see that certain tasks always take about 30% longer, so you are able to determine the common cause and take measures to avoid this in the future.
In this second e-course Maturity Level in our series of five, there is still little automatic behavior from MS Project that could jeopardize your mission to set up a comprehensive reporting cycle to your stakeholders. Instead, you will become very familiar with MS Projects interface to be able to make small changes fastly and accurately.
System Requirements
* A computer with Internet access and headphones (course contains audio) Supported browsers: -  IE 11 + Edge -  Firefox (Windows, iOS) -  Chrome (Windows, MacOS, iOS), Chrome for Android* -  Safari (MacOS, iOS) -  Default Android browser* (*Android versions: • 4.0 ICS, • 4.1-4.3 Jelly Bean, • 4.4 KitKat, • 5.0-5.1 Lollipop)
Table of Contents
* What is a PBS (Product Breakdown Structure) and a WBS (Work Breakdown Structure)
* Importance of Ordering Activities
* PBS/WBS Best Practices
* Tasks, Summary Tasks and Outdent levels
* Durations and their Estimates
* Estimating Principles
* Adding Tasks to the Baseline
* Schedule Quality Assessment
* Update Tasks
* Record Task Progress
* Reschedule Incomplete Work in one Go
* Evaluate the Project Schedule
* Reporting on Task Progress