Learn Microsoft Project - Resource Management (expert)
60 mins! Run Time
Employees
only
Provided
Friendly
Access
Description
At this point you have a perfect model of your project that will forecast your main deliveries. By now, we can promise you that your schedule already outperforms 80% of the schedules being made throughout the world.
- Top-down – use resources for all your tasks as you use your schedule to communicate their workload and what is expected of them
- The goal of planning with resources it to be able to determine what is needed of the variable parameter(s) to achieve the project goal:
- Timing and resources with constrained scope
- Scope and resources with constrained timing
- We will explain you how you can use the resource leveling features in MS project to explain for which of these three parameters you need help or a decision from your manager or steering committee.
System Requirements
- MS Project 2013 (or 2010) - A computer with Internet access and headphones (course contains audio) Supported browsers: - IE 11 + Edge - Firefox (Windows, iOS) - Chrome (Windows, MacOS, iOS), Chrome for Android* - Safari (MacOS, iOS) - Default Android browser* (*Android versions: • 4.0 ICS, • 4.1-4.3 Jelly Bean, • 4.4 KitKat, • 5.0-5.1 Lollipop)
Table of Contents
Off course you need to be able to assess exactly what to expect when enlisting for this course. The course contents includes, but is not limited to:
- Preparations Before Resource Loading
- How MSP Calculates: The Iron Formula
- Fixed Work, Fixed Duration of Fixed Units – what to use when?
- Effort Driven Scheduling – yes or no?
- Resource Types
- Enter Resources Using the Resource Sheet
- Resource Calendar
- Generic vs. Specific Resources
- Assigning a Resource
- Dedicated vs non-dedicated assignments
- % Assignment on a task, effectiveness, and absence
- Explaining the different units % fields in MS Project
- Assignment Units vs. Peak (Units)
- Replacing a Resource
- Views for Resource Management
- Resource Graph
- Team Planner
- Resource Usage and Task Usage
- Task Form and Resource Form
- Resource Leveling
- Method 1: Level Resources Manually
- Method 2: Let MSP Level For You
- Level One Task at a Time
- Level Selection
- Level Resource
- Level All
- The Resource Allocation View
- The Leveling Algorithm Explained
- After Solving Resource over Allocation